Well, in the last few days they have installed the septic tank, placed the drain fields, ran the gas & electrical lines from the street to the house and have backfilled the garage with rock in preparation for the slab. Pics are below. So far, move in date will be in early to mid April.
Tuesday, March 16, 2010
Thursday, March 11, 2010
Trenching
Well, yesterday they started trenching for the electric, gas, & water and today they are supposed to be doing the septic tank & drainfield. Pics below are from yesterday.
Tuesday, March 9, 2010
Next.....
The rock is done!...sheetrock that is. The whole house is done being sheetrocked and is now ready for tape & texture. A few things have to happen first. The excavator comes on wed for trenching the gas line, electric line for the light at the end of the driveway, electrical for underground to the house, septic, drainfield & well.
On the exterior, the lap siding is just about done and they have prepped for the rock. Above the lap siding will be shake so that will be coming along soon. Once the trenching is done & everything is connected, they can heat up the house so its ready for mud! See pics below.
On the exterior, the lap siding is just about done and they have prepped for the rock. Above the lap siding will be shake so that will be coming along soon. Once the trenching is done & everything is connected, they can heat up the house so its ready for mud! See pics below.
Thursday, March 4, 2010
Rockin' Royal
This has been a busy week at the jobsite. The electrical, plumbing, & HVAC are done....and they are sheetrocking up a storm! The front of the house is taking shape also. See pics below. I will post more tonight or tomorrow.
Thursday, February 11, 2010
Moving along.....
Well, met Scott, my contractor, at the house yesterday to figure out where the electrical outlets, switches and lights are going and to finalize the siding thoughts. Im impressed with the progress! Its looking great.... After I left, I picked out the flooring, tile, carpet & hardwoods, then picked out plumbing fixtures. The house is being wired today & we are definitely getting closer to sheetrock & being fully enclosed. Below are the newest pics.


Sunday, February 7, 2010
Mud....
Went out to the house today to see the weeks progress.....forgot how muddy it was. Had to put the truck in 4wheel drive in order to get down the driveway....cant wait for things to dry out a bit, so we can work on rerouting some of the groundwater. Lots happened in the past week, most of the windows are in, furnace is in, fireplace is in its spot, ductwork & plumbing are almost complete....almost ready for electrical. See pics below:
Friday, February 5, 2010
Time flies!
Well, the first week of February is already coming to a close. A lot has happened with the house since my last posting. The pictures below speak for themselves, but here are some updates that dont show in the pics. The plumbing drain pipes are in, heating ductwork is done, tub/shower unit for the guest bath is in place, windows are in, furnace is in, fireplace is in place and cabinets have been ordered. Coming soon is the siding on the front of the house, electrical, remaining plumbing & doors. Then....the inside! When I asked my contractor what if we were on schedule, he said yes & the move in date is scheduled for April 1st. Not sure if we'll make that date, but its exciting to know its that soon. See pics below...