Status Update

It's been a busy week or two...

Last week I met with a well drilling company and the designer that is drawing my house plans...not together, but in the same day. The well should be less than I was thinking, but can get started until I have the trees cleared so the trucks can get in. I then met with a guy yesterday about clearing the trees. I know I can do it cheaper on my own, but do I want to? I may just decide to take a day or two off and do it.

The house plans should be back from the designer this week with all of the modifications I made. Once I get them back, I can hand them over to the builder so he can give me a full estimate on costs.

The first step was to get the well done, so will be doing that along with the tree removal. Once that is done, the builder can design the septic, drain lines & house placement.

So....the ball is rolling, slowly so far, but it is rolling!